Left Wing Assembly

  • Prepared Workspace (Levelled sawhorses)
  • Removed left wing spar from delivery tube
  • Inspected for dents and other damages -> OK
  • Inspected seating of H-Brace in wing spar -> OK
  • Identified and inspected steel parts for left Wing assembly -> Travis needs to ship wing bolts for lift strut gusset installation
Pictures

Hours today     : 2.0
Hours forward : 75.25
Hours total       : 77.25