Sunday, September 20, 2009

Horizontal Stabilizer

  • Completed both C-Gussets (Rivet holes marked and drilled)
  • Drilled No 9 & 7 tubes (perpendicular tubes)
  • Fitted tubes with C-Gusset using silver Clecos
  • Made other two gussets to complete frame
  • Assembled frame with silver Clecos
  • Drilled all holes up to rivet size and fixed with copper Clecos
  • Started cutting tubes for cross-bracing (need brackets first)
Pictures

Hours today    : 7.0
Hours forward : 7.5
Hours total      : 14.5

No comments:

Post a Comment