- Completed both C-Gussets (Rivet holes marked and drilled)
- Drilled No 9 & 7 tubes (perpendicular tubes)
- Fitted tubes with C-Gusset using silver Clecos
- Made other two gussets to complete frame
- Assembled frame with silver Clecos
- Drilled all holes up to rivet size and fixed with copper Clecos
- Started cutting tubes for cross-bracing (need brackets first)
Hours today : 7.0
Hours forward : 7.5
Hours total : 14.5
No comments:
Post a Comment