Monday, September 28, 2009

Horizontal Stabilizer Complete!

  • Found 3/4" x 0.058" tube for reinforcement
  • Finished first frame
  • Installed Reinforcement "J" on second frame
  • Finished second frame
  • Horizontal Stabilizer Complete!
Pictures


Hours today    : 9.5
Hours forward: 24.5
Hours total      : 34.0

Saturday, September 26, 2009

Horizontal Stabilizer

  • Finished cross-bracing (tubes cut and deburred)
  • Up-drilled remaining holes to 1/8" and clecoed
  • Took frame apart for final deburring
  • Clecoed frame back together for riveting
  • Riveted frame except B-Gusset, because
  • Reinforcement "J" missing (can't find tube)
  • Cut and deburred tubing for second frame
  • Made Gussets A, B & C, deburred
  • Clecoed frame with silver Clecos (3/32")
Pictures

Hours today    : 7.0
Hours forward: 17.5
Hours total      : 24.5

Friday, September 25, 2009

Horizontal Stabilizer

  • Making second set of Gussets A & B
  • Making 3x Gusset D for cross-braces
  • Riveted D-Gussets in Place
  • Riveted Brace #10 in Place
Pictures

Hours today    : 3.0
Hours forward: 14.5
Hours total      : 17.5

Sunday, September 20, 2009

Horizontal Stabilizer

  • Completed both C-Gussets (Rivet holes marked and drilled)
  • Drilled No 9 & 7 tubes (perpendicular tubes)
  • Fitted tubes with C-Gusset using silver Clecos
  • Made other two gussets to complete frame
  • Assembled frame with silver Clecos
  • Drilled all holes up to rivet size and fixed with copper Clecos
  • Started cutting tubes for cross-bracing (need brackets first)
Pictures

Hours today    : 7.0
Hours forward : 7.5
Hours total      : 14.5

Saturday, September 19, 2009

Horizontal Stabilizer

  • Building Jig for horizontal Stabilizer
  • Cutting tubes, completing jig
  • Pre-cut C-Gusset marked to cut corner
  • Made C-Gusset test piece to test snips -> snips no good
Pictures

Hours today     : 2.0
Hours forward : 5.5
Hours total       : 7.5

Saturday, September 5, 2009

Kit 1 arrives

  • Brian arrived a few minutes short of 11am this morning
  • Unloading two boxes and "The Tube"
  • Immediate start of inventoring interrupted by Flying Lesson
  • As per Travis AN8-67A wingbolts on backorder
  • Same with the aileron control cables

Sept 05 2009 - Kit 1 arrives

Hours today     : 5.5
Hours forward : 0.0
Total hours      : 5.5