Talked to Travis @ Kolb today.
Kit 1 is all welded up and the 4130 steel parts
are on their way to get powdercoated.
It should be ready to be delivered in about two weeks.
Over a month early.
Now things are getting hectic.
Garage needs to be cleaned out, Delorean needs
to find another place...
The Plans and Drawings are in the mail today,
so I can start studying them.
No comments:
Post a Comment