Monday, August 31, 2009

Set up Shop

  • Delorean went to storage
  • Tools are on order with ACE Hardware (arrive Tuesday 09/01/09)
  • Model Aircraft are stored ouf the way
  • Table for light work and drawings is set

Wednesday, August 26, 2009

Delivery Date for Kit 1

  • Hardware is sorted and packed up
  • Steel 4130 Parts powdercoated white is done
  • Delivery Date set for Sept 5th 2009
  • Direct Frontdoor Delivery by Brian of Kolb Aircraft

Saturday, August 22, 2009

Manual and Drawings arrived

  • Box arrived with UPS on August 18th
  • Looking over drawings to check continuity -> OK
  • Contains CD with PDF-version of manual and Revision Updates
  • As per Travis at Kolb: New Drawings for Vortex Generators are missing (will ship with Kit 1)
The Tailfeathers will be the starting point



Gussets to be made

Friday, August 7, 2009

Kit 1 almost ready to deliver.

Talked to Travis @ Kolb today.
Kit 1 is all welded up and the 4130 steel parts
are on their way to get powdercoated.
It should be ready to be delivered in about two weeks.
Over a month early.
Now things are getting hectic.
Garage needs to be cleaned out, Delorean needs
to find another place...

The Plans and Drawings are in the mail today,
so I can start studying them.

Tuesday, August 4, 2009

Fun Stuff to kill some waitin' time...

PIREP of the month (Weather report filed by pilots in flight)

ANC UA/OV BIG SUSITNA RVR AREA/TM 2325/FL015/TP CSNA/RM ACFT IS BEING BOMBARDED BY INSECTS WHICH ARE NOT IN FORECAST