- Installed Drag Strut Braces
Pictures
Hours today : 1.5
Hours forward : 167.25
Hours total : 168.75
- Riveted entire Drag Strut Top and Bottom
- Installed lower Half Rib that was removed previously
- Cut and shaped upper Drag Strut Gusset
- Cut to length and deburred edges and corners
- Drilled and deburred holes on upper Drag Strut Gusset
- Riveted Gusset in Place (7 Rivets, 1/2" spacing)
Pictures
Hours today : 4.5
Hours forward : 162.75
Hours total : 167.25
- Adjusted angle on short Tube Stub for Drag Strut
- Sanded Tube Stub to fit
- Slid outer Drag Strut Tube onto Stub on Root Rib using Corrosion Protectant and Lubricant
- Started lower Gusset with Clecos
- Updrilled and deburred lower Gusset Wing Spar Side and Drag Strut Side
- Permanently installed Gusset
Pictures
Hours today : 4.50
Hours forward : 158.25
Hours total : 162.75