Sunday, November 29, 2009

Rudder

  • Cut leading edge 1" shorter to create flush finish with leading edge of vertical stab
  • Bent trailing edge of rudder
  • Installed leading edge insert for control horn
  • Installed upper and lower front ribs
  • Finished trailing edge
  • Installed front and rear ribs
Pictures

Hours today     : 6.25
Hours forward : 60.5
Hours total       : 66.75

Wednesday, November 25, 2009

Vertical Stabilizer

  • Couldn't get 3/4" x 0.125" tube from Aircraft Spruce, Kolb has to ship
  • Made gussets for lower portion of stab
  • Deburred
No Pictures

Hours today     : 0.5
Hours forward : 60.0
Hours total       : 60.5

Tuesday, November 24, 2009

Vertical Stabilizer

  • Updrilled, deburred and riveted bracing
  • Updrilled, deburred and riveted upper portion
  • Cut inboard tube for lower portion of stabilizer
  • Leading edge tube 2" too short, getting new one tomorrow
Pictures

Hours today     : 4.0
Hours forward : 56.0
Hours total       : 60.0

Sunday, November 22, 2009

Vertical Stabilizer

  • Making gussets for edges and braces
  • Had to make a new trailing edge, 1/2" longer
  • Drilled, deburred and clecoed gussets and mounting posts
  • Riveted bracing gussets in place
Pictures

Hours today     : 6.0
Hours forward : 50.0
Hours total       : 56.0

EAA Workshop "Fabric Covering"

I attended an EAA SportAir Workshop about
Fabric Covering an Airplane.
This was on the weekend Nov 14th and 15th 2009.

Maybe a little early, but nobody knows when the next chance
for a Workshop like that comes up.


Saturday, November 7, 2009

Vertical Stabilizer

  • Cutting tubes for bracing
  • Cutting angles into bracing and leading edge tubes
  • Fabricating 6" reinforcement tube for trailing edge
  • Riveted reinforcement tube in place
Pictures

Hours today     : 1.0
Hours forward : 49.0
Hours total       : 50.0