- Laid out dimension on worktable
- Cut hole into table for mounting ring
- Identified, cut (straight and miter) and deburred tubes
- Built jig for upper part of Vertical Stab
Pictures
Hours today : 2.0
Hours forward : 47.0
Hours total : 49.0
- Completed bracing the ribs
- Updrilled to #30, deburred and clecoed
- Checked alignment, OK
- Riveted right elevator
- ELEVATORS COMPLETE!
- Celebrated with a glass of seven year old Jim Beam :*-)
Pictures
Hours today : 3.5
Hours forward: 43.5
Hours total : 47
- Cut tubes for right elevator
- Flatened rib ends, deburred and drilled to 3/32"
- Bottom side completed and clecoed
Pictures
Hours today : 3.5
Hours forward : 40.5
Hours total : 43.5
- Read through elevator installation to determine whether leading edge tube is long enough -> OK
- Made outboard diagonal brace
- Updrilled Elevator to 1/8", deburred and clecoed
- Riveted Elevator except for inboard diagonal brace -> done at Elevator temp. installation
Pictures
Hours today : 2.0
Hours forward: 38.5
Hours total : 40.5
- Elevator ribs and braces
- Holes drilled 3/32" and clecoed
Pictures
Hours today : 3.0
Hours forward : 35.5
Hours total : 38.5
- Cutting tubes, deburring, flattening ends and drilled 3/32" holes
- Laid out dimensions on worktable, aligned tubes square
- One Side of frame clecoed
Pictures
Hours today : 1.5
Hours forward: 34.0
Hours total : 35.5